Northern Hospital Epping



Overview

Northern Hospital Inpatient Expansion Stage Two Epping

Construction of Northern Hospital Inpatient Expansion Stage Two include there to seven floors IPU tower, three storey theatre expansion, refurbishment of cath labs, medical imaging, and cardiology services. Vic Piling drilled test holes to assess the feasibility of bored piers as the site is characterized by 11m fill layers of dumping materials. In such condition, Vic Piling engaged B&D Consulting Engineers to design bored piers for buildings and for crane base. The most challenging was withstanding of drilled holes in loose layers mixed with boulders, tyre, leather, fragments of building materials. Despite this condition, Vic piling constructed bored piers of 900mm diameter, 15m deep.

 

Details

Location

Northern Hospital Epping

Client

Northern Hospital

Timeline

2019

Expertise

Design and Construct

Status

Completed

Partners

B&D Consulting Engineers, Kane Construction

About us

VIC PILING install bored piers from 300mm to 2100mm diameter and up to 40m deep. We have most efficient tools to drill rock and even granite. We are capable to install screw pile up to 1050mm diameter and 45m deep.

Address

48 Cambria Road, Keysborough, VIC 3173

Contact Detail

Where to find us