Stockyard Hill Wind farm

Gallery not found.



Overview

Stockyard Hill Wind Farm project consists of 149 wind turbines with capacity to produce 530MW. Vic Piling constructed 1200 mm diameter bored piers socketed into basaltic rock using our four drill rigs. Despite shallow and very hard layer of rock, we have drilled down to 11m deep piles.

 

Details

Location

Beaufort

Client

Mitchco Civil

Expertise

Construct Only

Partners

Goldwind Australia

About us

VIC PILING install bored piers from 300mm to 2100mm diameter and up to 40m deep. We have most efficient tools to drill rock and even granite. We are capable to install screw pile up to 1050mm diameter and 45m deep.

Address

48 Cambria Road, Keysborough, VIC 3173

Contact Detail

Where to find us